QUEEN ALIA INTERNATIONAL AIRPORT JORDAN
Project details
- Annual Savings : JD 90,000
- Payback Period : <2 Years
QUEEN ALIA INTERNATIONAL AIRPORT JORDAN
Challenges
Queen Alia International Airport has appointed Smart4Power to implement energy conservation measures to improve the chiller plant at the airport. Smart4Power recommended doing a detailed study at the chiller plant to evaluate the feasibility of enhancing the chiller plant operation and to guarantee the savings that would be achieved with a minimum investment.
Solutions
Smarat4Power believed that there is a scope for improving the present utility plant manager and therefore the energy savings by adding the following additional features:
- Dynamic resetting of supply temperature
- Match chiller loading and maintaining equal loading in the running chillers
- Optimizing the supply of the hot water temperature
- Monitoring and Tracking the plant performance using KPI’s