OTHAIM MALL AL RABWA - RIYADH

Project details

  • Payback Period : 2.3 years
  • Annual Energy Savings : SAR 2,170,541
  • Energy Savings (%): 24%

OTHAIM MALL AL RABWA

Challenge 

Othaim Mall Al Rabwa appointed Smart4Power to identify energy savings solutions for the mall. The electricity and water cost is becoming one of the single major cost of running the mall and its impact on the mall’s profit margins is likely to be impacted as the new electricity and water tariffs comes into effect.

Solution 

Smart4Power has identified different energy savings measures that can reduce the mall’s utility bill up to 2.45 million SAR / year

  • Installation of chiller Plant manger
  • Installation of evaporation cooling systems
  • AHU/ FAHU VFD installation
  • Thermal Coating for AHU duct/ package unit
  • Installation of control device to DX unit
  • Unstallation of control device to refrigeration units

 

Leave a reply

Your email address will not be published. Required fields are marked *